Three roofs to be completed:
• An upper roof consisting of a partial tear off
• A lower roof consisting of a full tear off with metal deck replacement
• A small hallway roof consisting of a full tear off with metal deck replacement
On upper roof, installed a single layer of 1.5″ Elevate insulation.
On lower roof, installed two layers of 2.6″ Elevate insulation.
On small hallway roof, installed a single layer of 1.5″ Elevate insulation.
On all roofs, installed a fully adhered Elevate EPDM .060 rubber roof system.
Shop-fabricated roof edge and metal system.
Elevate 20 Year Redshield Warranty.