Building consisted of two roofs:
Lower recover.
Upper full tear off to the deck.
Upper Roof:
Tear off of existing modified and insulation down to the deck.
Installed a single layer of 2.6″ Elevate insulation board.
Installed a fully adhered Elevate EPDM .060 rubber roof system.
Shop-fabricated roof edge and metal system.
Elevate 20 Year Redshield Warranty.
Lower Roof:
Recover over existing modified.
Installed 0.5″ HD Elevate insulation board.
Installed a fully adhered Elevate EPDM .060 rubber roof system.
Shop-fabricated roof edge and metal system.
Elevate 20 Year Redshield Warranty.